Ground-mount solar plants, delivered turnkey from land to grid

From captive plants for industry to MW-scale projects, WattPower manages engineering, procurement, construction and grid connection under one roof.

EPC delivery

Solar EPC contractor for ground-mounted plants

When roof space runs out, open land becomes your power plant. We design for terrain, soil and grid conditions so the plant is easy to build and efficient to run.

  • Single-point responsibility for design, supply and build
  • Fixed-tilt and tracker options evaluated on yield and cost
  • Evacuation and substation scope coordinated end-to-end
  • Progress reporting through every milestone
Discuss Your Project
MW scale ground-mounted solar plant
Scope

What our EPC scope covers

Feasibility

Land, shading, irradiance and grid-availability assessment

Engineering

Layout, electrical design, structure and civil drawings

Procurement

Modules, inverters, structures, cables, transformers

Construction

Civil, mechanical and electrical works with site safety

Grid connection

Evacuation, metering and DISCOM or utility coordination

Commissioning and O&M

Testing, handover and long-term operations support

Business models

Structured for your power strategy

  • Captive plants for industrial consumers
  • Group captive and open-access arrangements, subject to state regulations
  • Utility and government projects
  • Agricultural and land-owner solar where schemes apply

Regulatory and policy conditions vary by state and change over time. We confirm applicability at the start of every project.

Construction of a ground-mounted solar plant
Track record

MW-scale experience

Capacity, locations and client types delivered by the WattPower team.

50+ MWGround-mount delivered
25Plants commissioned
50+ MWUnder construction
25States served
FAQs

Ground-mount questions

What land area does a 1 MW ground-mount plant need?

Land requirement depends on module technology, tilt, row spacing and terrain. As a rough guide, utility plants often need around 4 to 5 acres per MW; we confirm after a topographic and shading assessment.

What does turnkey EPC include?

Feasibility, land and grid assessment, detailed engineering, procurement, civil and structure work, module and inverter installation, evacuation and grid connection, commissioning and handover, with optional O&M.

Can you help with grid connection and approvals?

Yes. We coordinate DISCOM or transmission-utility procedures, technical studies and statutory approvals relevant to your plant category.

Which business models do you support?

Captive, group captive, open-access and utility-scale projects can be discussed, subject to state regulations and policy at the time of the project.

How long does a ground-mount project take?

Timelines depend on capacity, land readiness and approvals. We share a milestone schedule with your proposal and report progress through the build.

Sunrise over solar panels
Go solar with WattPower

Have land and a power requirement?

Send us the location and capacity range. We will share a preliminary feasibility view and the next steps.